call us NOW at (800) 931-7565

republic

inspection

group

phase INSPECTION

A PHASE OR NEW CONSTRUCTION INSPECTION TAKES PLACE OVER THE PROGRESS OF NEW CONSTRUCTION. A TYPICAL SCHEDULE WOULD START JUST BEFORE THE FOUNDATION POUR. THE SECOND PHASE TAKES PLACE AFTER THE STRUCTURE FRAMING IS COMPLETE. THE THIRD AND FINAL PHASE IS AFTER THE EXTERIOR FINISHES ARE COMPLETE, BUT BEFORE INTERIOR DRYWALL IS INSTALLED. THE FINAL INSPECTION IS THE SAME AS A STANDARD INSPECTION, WHICH TAKES PLACE BEFORE CLOSING. THIS ALLOWS THE BUILDER TO CORRECT ANY ISSUES BEFORE THE HOUSE IS READY FOR MOVE IN.

infrared CAMERA INSPECTION included on all inspections